maint: Update docker.io/grafana/grafana Docker tag to v13.2.3-distroless #21

Merged
bot-ci merged 1 commit from renovate/all-dependencies into main 2026-09-29 09:40:38 +00:00
Owner

This PR contains the following updates:

Package Update Change
docker.io/grafana/grafana patch 13.2.2-distroless → 13.2.3-distroless

Configuration

📅 Schedule: (UTC)

  • Branch creation
    • At any time (no schedule defined)
  • Automerge
    • At any time (no schedule defined)

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

♻ Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Mend Renovate CLI.

This PR contains the following updates: | Package | Update | Change | |---|---|---| | [docker.io/grafana/grafana](https://github.com/grafana/grafana) | patch | `13.2.2-distroless` → `13.2.3-distroless` | --- ### Configuration 📅 **Schedule**: (UTC) - Branch creation - At any time (no schedule defined) - Automerge - At any time (no schedule defined) 🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Mend Renovate CLI](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0NC4xMTUuMTAiLCJ1cGRhdGVkSW5WZXIiOiI0NC4xMTUuMTAiLCJ0YXJnZXRCcmFuY2giOiJtYWluIiwibGFiZWxzIjpbXX0=-->
maint: Update docker.io/grafana/grafana Docker tag to v13.2.3-distroless
All checks were successful
ci/woodpecker/pr/pr_check Pipeline was successful
ci/woodpecker/pr/ci Pipeline was successful
e11e5f9e1c
bot-ci merged commit 2a4214c7f9 into main 2026-09-29 09:40:38 +00:00
bot-ci deleted branch renovate/all-dependencies 2026-09-29 09:40:38 +00:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
pandora/monitoring.image-copy!21
No description provided.